










Cultúrlann McAdam – Ó Fıaıch was renovated in 2010-2011 at a cost of 1.9 million pounds, with the addition of the Dillon Gallery. It would be reopened on September 19th by President Mary McAleese (WP). The images here show some of the construction hoardings from left (Nansen St) to front (Falls Road) to right (Fallswater St).
Click image to enlarge
Copyright © 2011 Peter Moloney
Nansen St: M06461 M06462 M06459 M06460
Falls Rd: [six instruments] M06458 [Hedge Row School] [Macadam] [Gearoıd Ó Caırealláın] M06457 M06456 [Caıfe Feırste] [Fáılte] [stack of books] M06455 [M06454] [M06453] M06452 [M06451] [M06450] M06449
Fallswater St: M06448
One thought on “Cultúrlann Redevelopment”